Everything about Cast in Situ Piles in Bangladesh

The 25mm thick heavy steel tube is pushed Together with the close shut by a metal shoe. On achieving the needed driving resistance, a full size cage is lowered in into the tube and stuffed with large slump concrete. The tube is then vibrated out leaving a shaft of concrete.You’ll also will need to ascertain the expected pile ability, which may b

read more